Page 21 - Product Catalogue 2023
P. 21

SUSTAINABILITY









 How we minimise our impact on the environment,
                                                                                         OUR PRODUCTS
 at every stage of production and supply.

 RENEWABLE ENERGY CONTRACTS                                   always have maximum efficiency and outstanding optical
                                                                design, so that you can be sure for every watt of power
                                                             consumed, you are getting maximum visibility on the road.

           SHIPPING OF
           FINISHED STOCK                             EU (BELGIUM)


           via road and sea, avoiding air
           shipping when and where
 LOCAL UK AND     possible. We only use couriers
 EUROPEAN SUPPLIERS   that have stated carbon         AUSTRALIA (CANBERRA)
           neutrality commitments
           and targets.
 Prioritised in the supply chain and
 during sourcing activities to
 reduce our upstream transport
 emissions, and to ensure they follow                 USA (DELAWARE)
 UK MANUFACTURING
 EU environmental and human rights
 standards and guidelines.               LOCAL
 in line with UKAS accredited,
                                         WAREHOUSING
 globally recognised environmental
 standards, including ISO14001.
                                         in each major market, for effective
                                         and low carbon distribution.






 WHAT HAPPENS TO OUR WASTE?                                BUT...     We’re not yet where we want to be.
                                                                      Here’s what we’re working on:
 Our waste suppliers aim for at least 98% landfill avoidance. They use their state-of-the-art sorting and recycling
 facilities to ensure that at least 50% of all waste collected is directly recycled and the rest is sent to EFW facilities
                                                                                                                 Supplier
 to produce electricity. Each of our collections are weighed, to help us with our carbon emissions tracking and           selection and
                                                                                      engagement in line with
 counting, and the company release their own waste figures monthly for full transparency.                   with a commitment to
                                                                               carbon reduction, and ultimately
                                                                                      our target for carbon
                                                                                            Supplier
                                                                                              neutrality.
                                                                                            selection
 MAGNET                   MAGNET                                                                   Upgrade    based on miles
                                                                                                ERP system
                                                                                       travelled to our factory.
 INCOMING  SHREDDER 1  PICKING STATION  SHREDDER 2  TROMMEL  EDDY CURRENT                    to track carbon of
 WASTE BAY  C  O  N  V  E  Y  O  R  BAYS BELOW  BAYS BELOW  AIR SEPARATOR             every component incoming,
                                                                    and product outgoing.
                                                                           Implementation
                                                                          of carbon offsetting.
                                                                                      UK facility to be run
                                                                                       directly off solar
                                                                                      power by Q3 2023.
 1  2  3  4  5  6  7        8              9                      in-house
                                                                   More
                                                                  component
 Pre-sorted material from   It is then fed into a shredder   The material falls onto    It then flows through an   The material enters the   The remaining material    The mixed material flowing   The materials   It then enters an eddy current   production, to reduce
 GBN Depots is delivered   by a mechanical loading   a conveyor. The purpose   over band magnet to   picking station where it is   is fed into the second   from the picking station   enter a second   separator to extract any   miles travelled    2025
 to the Materials   shovel. The material is   of using conveyors is    remove ferrous metals.  manually picked to recover   shredder where it    enters a trommel screen   over band magnet   nonferrous metals and through   for component parts.
 Recovery Facility (MRF)   shredded to a manageable   to provide a controlled,   wood, cardboard and paper   is shredded to 70mm.  which then separates into   to remove small   an air separator to remove the
 and tipped into the   size to recover the   constant flow of   which is discharged into   two components: soil    ferrous metals.  heavy components which is   OUR CARBON NEUTRAL DATE
 loading area.  recyclables (approx 200mm).  material.  the storage bays below.  and stones.  stored in another bunker.


 20                                                                                                         21
   16   17   18   19   20   21   22   23   24   25   26